Actions

Difference between revisions of "Cost Performance Index (CPI)"

(Created page with "The '''cost performance index (CPI)''' is a measure of the financial effectiveness and efficiency of a project. It represents the amount of completed work for every unit of co...")
 
m
 
Line 1: Line 1:
 
The '''cost performance index (CPI)''' is a measure of the financial effectiveness and efficiency of a project. It represents the amount of completed work for every unit of cost spent.
 
The '''cost performance index (CPI)''' is a measure of the financial effectiveness and efficiency of a project. It represents the amount of completed work for every unit of cost spent.
  
As a ratio it is calculated by dividing the budgeted cost of work completed, or earned value, by the actual cost of the work performed.
+
As a ratio, it is calculated by dividing the budgeted cost of work completed, or earned value, by the actual cost of the work performed.
  
For example, if a project has a earned value (EV) of £20,000 but actual costs (AC) were £12,000:
+
For example, if a project has an earned value (EV) of £20,000 but actual costs (AC) were £12,000:
  
 
CPI = EV / AC = 20,000 / 12,000 = 1.66
 
CPI = EV / AC = 20,000 / 12,000 = 1.66
  
 
If the ratio has a value higher than 1 then it indicates the project is performing well against the budget. A CPI of 1 means that the project is performing on budget. A CPI of less than 1 means that the project is over budget.<ref>Definition - What Does Cost Performance Index (CPI) Mean? [https://www.designingbuildings.co.uk/wiki/Cost_performance_index_(CPI) DB Wiki]</ref>
 
If the ratio has a value higher than 1 then it indicates the project is performing well against the budget. A CPI of 1 means that the project is performing on budget. A CPI of less than 1 means that the project is over budget.<ref>Definition - What Does Cost Performance Index (CPI) Mean? [https://www.designingbuildings.co.uk/wiki/Cost_performance_index_(CPI) DB Wiki]</ref>
 +
 +
 +
== See Also ==
 +
*[[Earned Value Management (EVM)]] - A project management technique for measuring project performance; CPI is a key metric in EVM.
 +
*[[Schedule Performance Index (SPI)]] - Another metric used in Earned Value Management, similar to CPI but focuses on-time performance.
 +
*[[Planned Value (PV)]] - The value of the work planned to be completed by a specific time, often used alongside CPI to evaluate project performance.
 +
*[[Actual Cost (AC)]] - The real costs incurred for the work performed on a project up to a specific time, used in the calculation of CPI.
 +
*[[Project Management]] - The discipline of initiating, planning, executing, and closing projects, where CPI is a commonly used performance metric.
 +
*[[Performance Measurement]] - General methods for evaluating effectiveness, efficiency, and quality, of which CPI is a specific instance.
 +
*[[Risk Management]] - The practice of identifying, analyzing, and responding to project risks, is relevant because a low CPI could indicate higher financial risk.
 +
*[[Cost Benefit Analysis]] - A technique for assessing the monetary pros and cons of undertaking a project, related indirectly as CPI can be a factor in such analyses.
 +
 +
 +
== References ==
 +
<references/>

Latest revision as of 14:25, 5 September 2023

The cost performance index (CPI) is a measure of the financial effectiveness and efficiency of a project. It represents the amount of completed work for every unit of cost spent.

As a ratio, it is calculated by dividing the budgeted cost of work completed, or earned value, by the actual cost of the work performed.

For example, if a project has an earned value (EV) of £20,000 but actual costs (AC) were £12,000:

CPI = EV / AC = 20,000 / 12,000 = 1.66

If the ratio has a value higher than 1 then it indicates the project is performing well against the budget. A CPI of 1 means that the project is performing on budget. A CPI of less than 1 means that the project is over budget.[1]


See Also

  • Earned Value Management (EVM) - A project management technique for measuring project performance; CPI is a key metric in EVM.
  • Schedule Performance Index (SPI) - Another metric used in Earned Value Management, similar to CPI but focuses on-time performance.
  • Planned Value (PV) - The value of the work planned to be completed by a specific time, often used alongside CPI to evaluate project performance.
  • Actual Cost (AC) - The real costs incurred for the work performed on a project up to a specific time, used in the calculation of CPI.
  • Project Management - The discipline of initiating, planning, executing, and closing projects, where CPI is a commonly used performance metric.
  • Performance Measurement - General methods for evaluating effectiveness, efficiency, and quality, of which CPI is a specific instance.
  • Risk Management - The practice of identifying, analyzing, and responding to project risks, is relevant because a low CPI could indicate higher financial risk.