With the analysis effort method, the stage of the project that forms the basis for the estimates is the analysis of requirements. Estimates for this can be arrived at by considering the stakeholders to be involved, the methods to be used (interviews or workshops for example), and by allocating sensible amounts of effort to these. The analysis effort method is probably the best choice where there is only a vague idea of the actual requirement but where the stakeholders to be involved in the analysis work can be identified.<ref>https://www.coursehero.com/file/p4po5q6/With-the-analysis-effort-method-the-stage-of-the-project-that-forms-the-basis/ What is Analysis Effort Method]</ref>
+
With the analysis effort method, the stage of the project that forms the basis for the estimates is the analysis of requirements. Estimates for this can be arrived at by considering the stakeholders to be involved, the methods to be used (interviews or workshops for example), and by allocating sensible amounts of effort to these. The analysis effort method is probably the best choice where there is only a vague idea of the actual requirement but where the stakeholders to be involved in the analysis work can be identified.<ref>[https://www.coursehero.com/file/p4po5q6/With-the-analysis-effort-method-the-stage-of-the-project-that-forms-the-basis/ What is Analysis Effort Method]</ref>
  
  
 
== References ==
 
== References ==
 
<references />
 
<references />

Revision as of 19:06, 2 December 2022

The analysis effort method is a method for estimating the duration of software engineering projects. It is best suited to producing initial estimates for the length of a job based on a known time duration for preparing a specification. Inputs to the method are numeric factors that indicate Size (S), Familiarity (F), and Complexity (C). These, with a duration for preparing the software specification, can be used in a look-up table (which contains factors based on previous experience) to determine the length of each of the following phases of the work. These are Design, Coding, and Unit testing and Testing. The method does not include any time for training or project management. This method should be used as one of a number of estimation techniques to obtain a more accurate estimate.[1]


With the analysis effort method, the stage of the project that forms the basis for the estimates is the analysis of requirements. Estimates for this can be arrived at by considering the stakeholders to be involved, the methods to be used (interviews or workshops for example), and by allocating sensible amounts of effort to these. The analysis effort method is probably the best choice where there is only a vague idea of the actual requirement but where the stakeholders to be involved in the analysis work can be identified.[2]