Difference between revisions of "IMAC (Install Move Add Change)"
m (The LinkTitles extension automatically added links to existing pages (https://github.com/bovender/LinkTitles).) |
|||
Line 1: | Line 1: | ||
IMAC is an acronym for Install Move Add Change . | IMAC is an acronym for Install Move Add Change . | ||
− | The term is in [[IT Management (Information Technology Management)|IT management]] use and summarizes the services in a life cycle of a job are important. The individual terms summarize various aspects related to the dynamics of a workplace. New employees need access to the information systems and a working IT workstation (Install) from day one. Moving to new business premises or locations should be quick and trouble-free. Hardware and software enhancements or changes to an existing IT system (add / change) must be carried out promptly and appropriately. | + | The term is in [[IT Management (Information Technology Management)|IT management]] use and summarizes the services in a life cycle of a job are important. The individual terms summarize various aspects related to the dynamics of a workplace. New employees need access to the information systems and a working IT workstation (Install) from day one. Moving to new [[business]] premises or locations should be quick and trouble-free. [[Hardware]] and [[software]] enhancements or changes to an existing IT [[system]] (add / change) must be carried out promptly and appropriately. |
*Install | *Install | ||
**System structure at the user's workplace | **System structure at the user's workplace | ||
Line 17: | Line 17: | ||
**Customization of software settings | **Customization of software settings | ||
**Uninstalling unneeded software applications | **Uninstalling unneeded software applications | ||
− | In addition, two additional service packages (IMAC / R / D) are common: | + | In addition, two additional [[service]] packages (IMAC / R / D) are common: |
*Remove | *Remove | ||
− | **Control of the devices to be uninstalled | + | **[[Control]] of the devices to be uninstalled |
− | **Secure deletion of existing data carriers | + | **Secure deletion of existing [[data]] carriers |
**Create a deletion report | **Create a deletion report | ||
**Dismantling of the defined system group | **Dismantling of the defined system group | ||
Line 26: | Line 26: | ||
*Dispose | *Dispose | ||
**Transport and environmentally friendly recycling | **Transport and environmentally friendly recycling | ||
− | **Hardware refresh (reprocessing / testing of the hardware) and return to the customer<ref>Definition - What is IMAC (Install Move Add Change)? [https://de.wikipedia.org/wiki/Install,_Move,_Add,_Change Wikipedia]</ref> | + | **Hardware refresh (reprocessing / testing of the hardware) and return to the [[customer]]<ref>Definition - What is IMAC (Install Move Add Change)? [https://de.wikipedia.org/wiki/Install,_Move,_Add,_Change Wikipedia]</ref> |
Latest revision as of 16:15, 6 February 2021
IMAC is an acronym for Install Move Add Change . The term is in IT management use and summarizes the services in a life cycle of a job are important. The individual terms summarize various aspects related to the dynamics of a workplace. New employees need access to the information systems and a working IT workstation (Install) from day one. Moving to new business premises or locations should be quick and trouble-free. Hardware and software enhancements or changes to an existing IT system (add / change) must be carried out promptly and appropriately.
- Install
- System structure at the user's workplace
- Initial installation and deployment of hardware components
- Initial installation and deployment of software applications
- Move
- Relocation of the workstation system to another location
- Change to another workstation system
- Change of end user
- Add
- Installation of additional hardware
- Installation of additional software
- Change
- Change of existing hardware configuration
- Updating of installed software
- Customization of software settings
- Uninstalling unneeded software applications
In addition, two additional service packages (IMAC / R / D) are common:
- Remove
Preparation for return transport, storage or disposal